One of the largest coal ports in Australia wanted to ensure accurate operational plans and optimize site production. Eka’s control systems solution suite was deployed to model, measure, track, control, and analyze the end-to-end mining process.

Read this case study to learn why they chose Eka

  • They operate physical assets at maximum efficiency in the storage and movement of physical bulk commodities, improving throughput and reducing costs
  • They shortened their loading times by automating task changes and backups
  • Machines work closer and remain safe, while reducing downtime between operations

DOWNLOAD CASE STUDY